Practical schedule risk analysis /
Main Author: | |
---|---|
Format: | Book |
Language: | English |
Published: |
Farnham, England :
Gower,
c2009.
|
Subjects: |
Table of Contents:
- Why schedule risk analysis? Looking beyond the critical path method
- Uncertainty in activity durations : creating probability distributions
- Uncertainty along a schedule path : using Monte Carlo simulation
- A good project schedule is needed : critical path method scheduling 101
- Collecting risk data : exploring methods and problems
- Where parallel paths merge : introducing the "merge bias" and risk criticality
- Probabilistic branching : analyzing discrete risk events
- Using risks to drive the analysis and prioritize risks: introducing the "risk driver" method
- Schedule contingency plans : using conditional branching
- When activity durations move together : incorporating correlation
- Risk management in the organization : identifying the mature risk management culture.